CHARACTERISTICS & ADVANTAGES

  • Features of M1 card identification & charging transactions.

    01
  • Protection as good as IP54.

    02
  • Touch screen to show charging details.

    03
  • Online diagnosis, repair and software updates.

    04
  • CE certificate issued by world famous lab TUV.

    05
  • Supporting OCPP 1.6/ OCPP2.0.

    06
  • Protection of Over current, Under voltage, Over voltage, Surge, Short circuit, Over temperature, Ground fault, etc.

    07
EVSED90KW-D1-EU01 (1)-pixian

APPLICATION

Providing fast and safe charging for lithium battery powered cars, taxis, buses, dump trucks, etc.

  • Application (1)
  • Application (2)
  • Application (3)
  • Application (4)
  • Application (5)
ls

SPECIFICATIONS

Model No.

EVSED90KW-D1-EU01

AC Input

 

Input Rating

400V 3ph 160A Max.

Number of Phase / Wire

3ph / L1, L2, L3, PE

Power Factor

>0.98

Current THD

<5%

Efficiency

>95%

DC Output 

Output Power

90kW

Output Voltage Rating

200V-750V DC

Protection

Protection 

Over current, Under voltage, Over voltage, Residual

current, Surge protection, Short circuit, Over

 temperature, Ground fault

UI

Screen 

10.1 inch LCD screen & touch panel

Languages

English (Other languages available upon request)

Charging Options

Charging options:

Charge by duration, Charge by energy, Charge

by fee

Charging Interface

CCS2

Start Mode

Plug & Play / RFID card / APP

Communication

Network

Ethernet, Wi-Fi, 4G

Open Charge Point Protocol

OCPP1.6 / OCPP2.0

Environment

Working Temperature

-20 ℃ to +55℃ (derated when over 55℃)

Storage Temperature

-40℃ to 70℃

Humidity 

< 95% relative humidity, non-condensing

Altitude 

Up to 2000 m (6000 feet)

Mechanical 

Ingress Protection Rating

IP54

Enclosure Protection against

 External Mechanical Impacts

IK10 according to IEC 62262

Cooling 

Forced air

Charging Cable Length

5m

Dimensions (L*W*H)

700*750*1750mm

Weight

310kg

Compliance

Certificate

CE / EN 61851-1/-23

INSTALLATION GUIDE

01

Please double check whether the wooden box is damaged before openning it. If it is not damaged, use professional tools to unpack the wooden box with care.

TUV Certified DC Charging Station EVSED90KW-D1-EU01 (2)
02

The charging station should be placed on the horizontal.

TUV Certified DC Charging Station EVSED90KW-D1-EU01 (3)
03

When charging station is power off, ask professionals to open the side door of the charging station and connect the input cable to the power distribution switch according to the number of phases.

TUV Certified DC Charging Station EVSED90KW-D1-EU01 (1)

Dos And Don’Ts In Installation

  • Place the charging station on heat-resistant and horizontal object. Do not put it upside down or make it slope.
  • Please leave the charging station with enough space for cooling. The distance between the air inlet and the wall should be more than 300mm, and between the wall and the air outlet should be more than 1000mm.
  • For better cooling, the charging station should work in an environment with temperature from -20 ℃ to 55℃.
  • Foreign objects like paper pieces or metal fragments must NOT get into the EV charger to avoid fire accident.
  • After connecting to the power supply, the charging plug connectors must NOT be touched, or you may have the risk of electric shock.
  • The ground terminal should be well grounded to ensure safety.
Dos And Don’Ts In Installation

OPERATION GUIDE

  • 01

    Well connect the charging station to the grid and then tap the air switch to turn on the charging station.

    EVSED90KW-D1-EU01 (5)
  • 02

    Uncover the charging port in the electric vehicle and insert the charging plug into the charging port.

    EVSED90KW-D1-EU01
  • 03

    Swipe M1 card at the card swiping area to charge the EV. After the charging is finished, swipe the M1 card again to stop charging.

    EVSED90KW-D1-EU01 (3)
  • 04

    After the charging is finished, swipe the M1 card again to stop charging.

    EVSED90KW-D1-EU01 (4)
  • Dos and Don’ts In Operation

    • The connection between charging station and the grid should be under the guidance of professionals.
    • The charging port should be free from wet and foreign objects, and the power cord should be intact.
    • Please push the “emergency stop” button to stop charging if there is any danger.
    • We must NOT pull out the charging plug or start the vehicle during the charging process.
    • Do NOT touch the charging socket jack or connectors.
    • Nobody should be allowed in the car during charging.
    • The air inlet and outlet should be cleaned every 30 calendar days.
    • DO NOT DISASSEMBLE THE charging station BY YOURSELF, OR YOU MAY HAVE THE RISK OF ELECTRIC SHOCK. YOU MAY CAUSE HARM TO THE charging station DURING YOUR DISASSEMBLING AND YOU MAY NOT ENJOY AFTER-SALE SERVICE BECAUSE OF THE DISASSEMBLING.
    Dos And Don’Ts In Installatio

    Dos and Don’ts in Using the Charging Plug

    • The connection between the charging plug and the charging socket should be in good state. The buckle of the charging plug should be well put in the slot of the charging socket, or the charging may fail.
    • Do not use the charging plug hard and roughly.
    • When the charging plug is not in service, cover it with the plastic cap to protect it from water or dust.
    • Please do not place the charging plug on the ground randomly.
    Dos And Don’Ts In Installation

    Instructions in Emergency Unlocking

    • When the charging plug is locked in the charging port and can not be pulled out, move the unlocking bar slowly into the emergency unlocking hole.
    • Move the bar towards the direction of plug connector to unlock the plug.
    • Notice: Only under emergency can the emergency unlocking is permitted.
    Dos And Don’Ts In Installatio